From: route@monster.com
Sent: Saturday, April 16, 2016 2:04 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Jesse Petersen
630-885-9747
Page three Jesse
Petersen
605
Garden Circle Apt-7
Streamwood, IL 60107
630-885-9747
jesseptrsn@yahoo.com PROFILE Construction
Manager with 10 years wireless industry experience, 8 years wireless
construction management experience, and 12 years microwave installation
experience, military and civilian. Managed build of 1300 sites
efficiently, producing a quality product for AT&T. Installed/
turned up switching equipment, DAS, transmission and power plants.
Proficient in many aspects of security and surveillance equipment.
Broad knowledge in engineering Tactical Automated Security Systems, Wide-Area
Surveillance Thermal Imagers, CCTV and similar systems. Excellent
communicator at all levels of the organization. ACCOMPLISHMENTS ·
Instrumental
in wining additional transport work for 800 sites, which completed on time
and invoiced within a twelve-month period increasing revenue for the year by
28% in my market. ·
Led efforts
in Ericsson winning NSB construction of Dave Wireless 200 site network. ·
Successfully
executed the Heinz Field DAS build on time and under budget raising revenue
by 10% on the overall margin. ·
Leveraged
workloads to obtain a line item cost reduction from our vendors of 8% on
AT&T 3rd carrier build. ·
Located low
cost properties for the selection of new cell site construction for Crickets
Chicago build. ·
Successively
identified and recovered 300 + thousand dollars of cost from our vendors
during true ups. ·
Achieved a
79% first review passes on AT&T reviewed closeout packages after their 3rd Carrier
build. ·
Improved
documentation processes that lowered timelines and cost and ensured revenue
was received on schedule. PROFESSIONAL EXPERIENCE ERICSSON, Chicago,
IL
Market Lead
Construction Manager
III
2009 – April 2015 ·
Assistant
Project Manager and Lead Construction Manager on the AT&T/Alltel 600 site
project in the central region. ·
Led weekly
meeting determining the status of market project, realign the schedule, and
send the updated data to executive management team of Ericsson. ·
Created
scopes of work to construction vendor to turn into bid packages and to
complete work at site. ·
Ensured all
PO’s, consent, construction drawings and permits were in place before issuing
work. ·
Tracked all
progress on site acquisition, construction, and give status reports to the
customer daily. ·
Prepared and
loaded closeout documentation into Siterra for the customers review an
acceptance. ·
Tracked and
corrected all site deficiencies and ensured all departments received
notification. ·
Sole
Construction Manager on several DAS builds to including Heinz Field, PA and
Chicago Public Schools. Lead
Implementation Manager 2008
– 2009 ·
Lead
Implementation Manager on Dave Wireless UMTS new build project in Toronto
Canada. ·
Conducted
site walks and created drawings of the site to use as exhibits in leasing
packages. ·
Inputted all
site information into Site Handler Ericssons document storage system. ·
Built basic
EPL and none EPL material lists for site equipment configuration and placed
orders. ·
Lead
Construction Manager on AT&T UMTS, 2nd Carrier and Tower MOD project Build in Indianapolis, IN. ·
Managed and
tracked 15 crews conducting site audits, gave daily status report to customer
and Ericsson. · Conducted 380 feed packages in order to ensure RFDS and
scopes of work were correct and complete. ·
Planned and
held training how the sites should be built and scheduled to meet time lines. ·
Supervised
the construction of 134 2nd Carrier sites with a run rate of eleven sites a week
utilizing 12 crews. ·
Supervised a
Tower MOD build of 70 sites with a run rate of nine sites a week utilizing 10
crews. ·
Delivered
daily tracker of project status to AT&T, the GC’s and Ericsson Management
teams and conferenced with customer weekly to go over site status of Site
Acquisition, Construction and Closeout. CRICKET, Chicago, IL
2007 – 2008 Contracted Lead
Construction Manager ·
Supervised
the daily performance of 3 Construction Managers while undertaking Crickets
network build. ·
Reviewed and
redlined construction drawing using input from RF, site acquisition and local
city authorities. ·
Managed and
tracked crews conducting site audits and uploaded findings and reports into
Siterra for RF to use for site selection. ·
Tracked site
acquisition teams insuring construction readiness, property owner info,
jurisdictional restrictions, structural, and building permits. ·
Conducted BID
walks for new site construction with GC’s and insured the GC’s met Cricket
standards. ·
Delivered
daily tracker of project status and concerns to Cricket management. ·
Reviewed
final drawing and created a bill of materials based on findings. ·
Overall
responsible for the site acquisition and construction on 200 sites in the
Chicago South market for Cricket Communication. ERICCSON, Chicago,
IL 2006 –
2007 Contracted
Construction Manager II ·
Construction
Manager on the T-Mobile UMTS Build in Los Angeles and Las Vegas. ·
Reviewed and
turned in 400+ site audits to T-Mobile for RFDS completion. ·
Tracked and
Managed 15 crews conducting site audits and gave daily status report to the
costumer and Ericsson upper Management. ·
Helped
created national training plan used for the training of the ASP before
project launch. ·
Construction
Manager on Cingular UMTS/ RET build in San Francisco Bay area for Ericsson. ·
Conducted
punch walks to insure all equipment was properly installed and reported all
deficiencies. ·
Delivered
daily tracker of project status to Cingular, the GC’s and Ericsson Management
teams. ·
Reviewed
UMTS/RET closeout documents to insure quality and accuracy before delivery to
customer. ·
Delivered 294
closeout packages to Cingular receiving 100% acceptance. BECHTEL, Atlanta, GA
2006 Consultant Project
Manager (Greythorne) ·
Project
Manager on Cingular UMTS builds in New Orleans area for Bechtel. ·
Involved in
all project phases including, bid walks, equipment orders, construction,
quality control and closeout delivery. ·
Lead Field
Supervisor on Cingular UMTS/ Growth integration project conducted in Seattle
for Lucent. ·
Tested lines
on newly renovated Cingular sites and became the onsite liaison, assured
customer satisfaction while supervising all contracted personnel on rip and
replace, Ericsson to Nokia. ·
Conducted
site walks ensuring all equipment installed achieved completion properly and
met AT&T guidelines before the night of cutover and systems launch. CINGULAR, Atlanta,
GA 2006 Consultant Lead
Technician ·
Worked as a
Decommission Technician for Cingular rip and replace in Atlanta market, Nokia
to Ericsson. ·
Performed
site surveys for installation of cellular equipment and entered information
into a database. Consultant Project
Lead ·
Managed and
supervised 5 test teams for a Cingular UMTS project in the Atlanta market. ·
Responsible
for all logistical support to include equipment delivery and to ensure
personnel were where they needed to be. ·
Provided
turnover packages that, I prepared myself using Site Master Programs. INDUSTRY TRAINING |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Macedonian |
Intermediate |
|
|
|